Change of use to residential: what changes with the new Turin PRGC

Change of use to residential: what changes with the new Turin PRGC

Introduction to change of use

The change of use from shop or warehouse to residential is a procedure affecting more and more owners in Italian cities, Turin included. With the new Turin municipal master plan (PRGC) some urban planning and procedural rules have changed, affecting times, requirements and costs for those wanting to convert commercial premises or storage into residential units. This guide explains practically what has changed, what checks to perform and how to proceed to avoid surprises.

What the new master plan establishes on land use designations

The new PRGC updates urban compatibility criteria and directions for urban regeneration. Specifically, compared to previous versions, the plan aims to encourage the redevelopment of existing building stock but with attention to safety, services and residential quality. For change of use this translates into two key elements:

  • Geometric and microzoning constraintsSome areas, especially in historic centres or reconverted industrial zones, have stricter constraints requiring preliminary compatibility checks.
  • Representation of urban servicesAccess to light, green areas, parking and public services is considered in granting permissions, to guarantee minimum livability standards.

Administrative procedures: simplifications and requirements

The new plan introduces guidelines to streamline some procedures, but does not completely remove mandatory steps. Generally, the phases are:

  1. Preliminary verification of the urban destination of the unit and of building or historic constraints;
  2. Technical project demonstrating compliance with standards on safety, hygiene and minimum housing requirements (ceiling heights, lighting, ventilation, sanitary facilities, etc.);
  3. Submission of application: often a certified notification of commencement of works (SCIA) suffices, but for major changes or protected zones a building permit may be required;
  4. Municipal checks and issuing of authorisation or reasoned refusal.

Important: the new PRGC favours simplified routes for regeneration projects that improve urban quality but requires more complete technical documentation on energy consumption and accessibility.

Tax aspects and impact on building rights

Change of use may impact IMU, Tari and tax benefits applicable to the property. Those converting commercial premises to residential might need to update cadastral income and incur costs for utility connections or system upgrades. Moreover, in some areas the PRGC may set different building indices or density parameters affecting possible expansions or additional storeys.

Most frequent technical requirements with the new PRGC

In conversion works the Municipality increasingly requires:

  • Proof of sound insulation and thermal performance compliant with regional limits;
  • Verification of accessibility (lift or barrier-free access) if the unit is in multi-unit buildings subject to law;
  • Upgrade of systems (electricity, gas, water) to current standards with conformity certifications;
  • Waste disposal solutions and external space provisions where required by the plan.

Implications for Turin and investors in the city

For those operating in Turin the new plan offers regeneration opportunities, especially in central districts and former industrial areas undergoing transformation. However, it is advisable to:

  • Check the urban zone of the property: mixed use areas may facilitate change of use, while protected or service-designated zones may impose limits;
  • Consider local housing demand: in high-demand areas conversion can increase value but requires investments in energy class and comfort;
  • Technical drawbacks such as noise levels, lack of windows on main facade or historic constraints complicating work.

How to proceed: practical checks before buying or starting work

Before buying a shop or warehouse with the intention to convert into residence, we recommend:

  1. Requesting an urban planning consultation from the Municipality or a qualified technician to confirm feasibility within the PRGC framework;
  2. Checking cadastral use and existing building/planning compliance;
  3. Requesting quotes for main works (systems, insulation, possible subdivisions) and estimating overall times and costs;
  4. Check for any incentives or urban regeneration tools activated by the Municipality or Region for recovery projects.

Useful links

To deepen your understanding of the regulatory framework and market implications, you can also read the article What changes in Turin's urban development plan and, if you need support with technical evaluation, How to choose the most competent real estate agent.

Practical advice and conclusion

In summary, here are the practical steps to undertake a change of use under Turin's new PRGC:

  • Carry out a preliminary urban planning check and assess technical constraints;
  • Prepare a project that meets living standards, safety, and energy performance requirements;
  • Calculate real costs: works, municipal charges, cadastral update and taxes;
  • Consider timelines: even with simplifications, procedures and works may take months;
  • Rely on professionals: a technician and a real estate consultant help to avoid costly mistakes.

If you are considering a change of use project in Turin, we can offer you a technical and commercial opinion to estimate feasibility, costs and timing based on the new urban plan. Contact us for tailored advice: we will help you understand the next steps without obligation.